ADGAS LNG Train

ADGAS LNG Train show reference
Page 1

Client: Abu Dhabi Gas Liquefaction Company
Execution Period: 2006 – 2008
Contract Value: € 11 Million
Services: EPC

Project Description:

  • EPCC of 2 liquid nitrogen (1,550 Nm3/hr) generating units
  • Design, supply and erection of two liquid nitrogen storage vessels (75 tons each)
  • Civil, electrical, controls and instrumentation works for two new nitrogen units and auxiliaries
  • Demolition of two old units

Plant Description:

  • 3 x LNG trains with capacity of 6.4 million metric tons of LNG per year
Page 2

Client: Abu Dhabi Gas Liquefaction Company
Execution Period: 2006 – 2008
Contract Value: € 11 Million
Services: EPC

Project Description:

  • EPCC of 2 liquid nitrogen (1,550 Nm3/hr) generating units
  • Design, supply and erection of two liquid nitrogen storage vessels (75 tons each)
  • Civil, electrical, controls and instrumentation works for two new nitrogen units and auxiliaries
  • Demolition of two old units

Plant Description:

  • 3 x LNG trains with capacity of 6.4 million metric tons of LNG per year
Page 3

Client: Abu Dhabi Gas Liquefaction Company
Execution Period: 2006 – 2008
Contract Value: € 11 Million
Services: EPC

Project Description:

  • EPCC of 2 liquid nitrogen (1,550 Nm3/hr) generating units
  • Design, supply and erection of two liquid nitrogen storage vessels (75 tons each)
  • Civil, electrical, controls and instrumentation works for two new nitrogen units and auxiliaries
  • Demolition of two old units

Plant Description:

  • 3 x LNG trains with capacity of 6.4 million metric tons of LNG per year

Client: Abu Dhabi Gas Liquefaction Company
Execution Period: 2006 – 2008
Contract Value: € 11 Million
Services: EPC

Project Description:

  • EPCC of 2 liquid nitrogen (1,550 Nm3/hr) generating units
  • Design, supply and erection of two liquid nitrogen storage vessels (75 tons each)
  • Civil, electrical, controls and instrumentation works for two new nitrogen units and auxiliaries
  • Demolition of two old units

Plant Description:

  • 3 x LNG trains with capacity of 6.4 million metric tons of LNG per year

Takreer / Tecnimont Heaters

Takreer / Tecnimont Heaters show reference
Page 1

Client: Takreer/Tecnimont
Execution Period: 2010 – 2011
Contract Value: € 5.5 Million
Services: Refurbishment

Project Description:

  • Pre-fabrication of components for convection and radiant section of two condensate heaters incl. inspection and overhaul of burners
  • Supply and replacement of skin thermo-couples, refractory and insulation
  • All site works to be completed within a shut down duration of 35 days for each heater

Plant Description:

  • Heaters for the condensate trains (2 x140,000 BPD)
Page 2

Client: Takreer/Tecnimont
Execution Period: 2010 – 2011
Contract Value: € 5.5 Million
Services: Refurbishment

Project Description:

  • Pre-fabrication of components for convection and radiant section of two condensate heaters incl. inspection and overhaul of burners
  • Supply and replacement of skin thermo-couples, refractory and insulation
  • All site works to be completed within a shut down duration of 35 days for each heater

Plant Description:

  • Heaters for the condensate trains (2 x140,000 BPD)

Client: Takreer/Tecnimont
Execution Period: 2010 – 2011
Contract Value: € 5.5 Million
Services: Refurbishment
 
Project Description:

  • Pre-fabrication of components for convection and radiant section of two condensate heaters incl. inspection and overhaul of burners
  • Supply and replacement of skin thermo-couples, refractory and insulation
  • All site works to be completed within a shut down duration of 35 days for each heater

Plant Description:

  • Heaters for the condensate trains (2 x140,000 BPD)

Pearl GTL Plant

Pearl GTL Plant show reference
Page 1

Client: Pearl GTL (Shell)
Execution Period: 2007 – 2011
Contract Value: € 31 Million
Services: Construction


Project Description:

  • Mechanical erection of effluent treatment plant, including EPC of tanks
  • Fabrication and erection, painting, insulation of piping works
  • Equipment installation works
  • Pre-commissioning and hand over

Plant Description:

  • Gas To Liquid (GTL) plant producing
    140,000 bpd of GTL as well as 120,000 bpd of condensate
Page 2

Client: Pearl GTL (Shell)
Execution Period: 2007 – 2011
Contract Value: € 31 Million
Services: Construction


Project Description:

  • Mechanical erection of effluent treatment plant, including EPC of tanks
  • Fabrication and erection, painting, insulation of piping works
  • Equipment installation works
  • Pre-commissioning and hand over

Plant Description:

  • Gas To Liquid (GTL) plant producing
    140,000 bpd of GTL as well as 120,000 bpd of condensate

Client: Pearl GTL (Shell)
Execution Period: 2007 – 2011
Contract Value: € 31 Million
Services: Construction


Project Description:

  • Mechanical erection of effluent treatment plant, including EPC of tanks
  • Fabrication and erection, painting, insulation of piping works
  • Equipment installation works
  • Pre-commissioning and hand over

Plant Description:

  • Gas To Liquid (GTL) plant producing
    140,000 bpd of GTL as well as 120,000 bpd of condensate

Gasco Coalescer Project

Gasco Coalescer Project show reference
Page 1

Client: Abu Dhabi Gas Industries Ltd
Execution Period: 2011 – 2012
Contract Value: € 20 Million
Services: EPC

Project Description:

  • Design, supply, installation and commissioning of 5 Coalescer units at Habshan NGL complex with motors and associated civil, mechanical, electrical and instrumentation works
  • To remove free water and suspended solids from hydrocarbon condensate (separated as part of gas processing) prior to the stabilizers

Plant Description:

  • Total filtration capacity: 1,449m³/h
Page 2

Client: Abu Dhabi Gas Industries Ltd
Execution Period: 2011 – 2012
Contract Value: € 20 Million
Services: EPC

Project Description:

  • Design, supply, installation and commissioning of 5 Coalescer units at Habshan NGL complex with motors and associated civil, mechanical, electrical and instrumentation works
  • To remove free water and suspended solids from hydrocarbon condensate (separated as part of gas processing) prior to the stabilizers

Plant Description:

  • Total filtration capacity: 1,449m³/h
Page 3

Client: Abu Dhabi Gas Industries Ltd
Execution Period: 2011 – 2012
Contract Value: € 20 Million
Services: EPC

Project Description:

  • Design, supply, installation and commissioning of 5 Coalescer units at Habshan NGL complex with motors and associated civil, mechanical, electrical and instrumentation works
  • To remove free water and suspended solids from hydrocarbon condensate (separated as part of gas processing) prior to the stabilizers

Plant Description:

  • Total filtration capacity: 1,449m³/h
Page 4

Client: Abu Dhabi Gas Industries Ltd
Execution Period: 2011 – 2012
Contract Value: € 20 Million
Services: EPC

Project Description:

  • Design, supply, installation and commissioning of 5 Coalescer units at Habshan NGL complex with motors and associated civil, mechanical, electrical and instrumentation works
  • To remove free water and suspended solids from hydrocarbon condensate (separated as part of gas processing) prior to the stabilizers

Plant Description:

  • Total filtration capacity: 1,449m³/h

Client: Abu Dhabi Gas Industries Ltd
Execution Period: 2011 – 2012
Contract Value: € 20 Million
Services: EPC

Project Description:

  • Design, supply, installation and commissioning of 5 Coalescer units at Habshan NGL complex with motors and associated civil, mechanical, electrical and instrumentation works
  • To remove free water and suspended solids from hydrocarbon condensate (separated as part of gas processing) prior to the stabilizers

Plant Description:

  • Total filtration capacity: 1,449m³/h

PIC Shuaiba Fertilizer Plant

PIC Shuaiba Fertilizer Plant show reference
Page 1

Client: Petrochemical Industries Company
Execution Period: 2008 – 2010
Contract Value: € 5 Million
Services: Rehabilitation

Project Description:

  • Replacement of transfer lines including refractory of primary and secondary reformers of an ammonia production line
  • Process gas temperatures up to 950ºC
  • Turn-around of 42 days

Plant Description:

  • Fertilizer plant (3 x ammonia and 3 x urea production lines total 3000 t/day)

Client: Petrochemical Industries Company
Execution Period: 2008 – 2010
Contract Value: € 5 Million
Services: Rehabilitation

Project Description:

  • Replacement of transfer lines including refractory of primary and secondary reformers of an ammonia production line
  • Process gas temperatures up to 950ºC
  • Turn-around of 42 days

Plant Description:

  • Fertilizer plant (3 x ammonia and 3 x urea production lines total 3000 t/day)