TAPCO Taweelah B

TAPCO Taweelah B show reference
Page 1

Client: TAPCO
Execution Period: 2005 – 2008
Contract Value: € 39.4 Million
Services: EPC

Project Description:

  • Engineering, procurement and construction (EPC) to rehabilitate the existing power and desalination plant
  • Upgrade of new firing systems and conversion to low NOx, new black start diesel generators, metering systems for energy and water production, sewage treatment plant, and gas turbines air inlet fogging system for power enhancement

Plant Description:

  • 6 Steam turbines (6x Alstom)
  • 6 Auxiliary boilers (6x Dt. Babcock)
  • 5 GTs (2x GE 9E, 3x Siemens V94.3A)
  • 5 HRSGs (2x Aalborg, 3x Doosan)
Page 2

Client: TAPCO
Execution Period: 2005 – 2008
Contract Value: € 39.4 Million
Services: EPC

Project Description:

  • Engineering, procurement and construction (EPC) to rehabilitate the existing power and desalination plant
  • Upgrade of new firing systems and conversion to low NOx, new black start diesel generators, metering systems for energy and water production, sewage treatment plant, and gas turbines air inlet fogging system for power enhancement

Plant Description:

  • 6 Steam turbines (6x Alstom)
  • 6 Auxiliary boilers (6x Dt. Babcock)
  • 5 GTs (2x GE 9E, 3x Siemens V94.3A)
  • 5 HRSGs (2x Aalborg, 3x Doosan)
Page 3

Client: TAPCO
Execution Period: 2005 – 2008
Contract Value: € 39.4 Million
Services: EPC

Project Description:

  • Engineering, procurement and construction (EPC) to rehabilitate the existing power and desalination plant
  • Upgrade of new firing systems and conversion to low NOx, new black start diesel generators, metering systems for energy and water production, sewage treatment plant, and gas turbines air inlet fogging system for power enhancement

Plant Description:

  • 6 Steam turbines (6x Alstom)
  • 6 Auxiliary boilers (6x Dt. Babcock)
  • 5 GTs (2x GE 9E, 3x Siemens V94.3A)
  • 5 HRSGs (2x Aalborg, 3x Doosan)

Client: TAPCO
Execution Period: 2005 – 2008
Contract Value: € 39.4 Million
Services: EPC
  
Project Description:

  • Engineering, procurement and construction (EPC) to rehabilitate the existing power and desalination plant
  • Upgrade of new firing systems and conversion to low NOx, new black start diesel generators, metering systems for energy and water production, sewage treatment plant, and gas turbines air inlet fogging system for power enhancement

Plant Description:

  • 6 Steam turbines (6x Alstom)
  • 6 Auxiliary boilers (6x Dt. Babcock)
  • 5 GTs (2x GE 9E, 3x Siemens V94.3A)
  • 5 HRSGs (2x Aalborg, 3x Doosan)

MEW - Sabiya Plant I&C Maintenance

MEW - Sabiya Plant I&C Maintenance show reference
Page 1

Client: Ministry of Water & Electricity
Execution Period: 2007 – 2012
Contract Value: € 19 Million
Services: Maintenance

Project Description:

  • Maintenance of field instruments and control systems
  • Modification and maintenance of control valves
  • Provision of skilled manpower and specialist services for several OEMs

Plant Description:

  • 8 ST x 300 MW, 8 MSF x 12 MIGD
  • 8 BLR x 975 t/h
Page 2

Client: Ministry of Water & Electricity
Execution Period: 2007 – 2012
Contract Value: € 19 Million
Services: Maintenance

Project Description:

  • Maintenance of field instruments and control systems
  • Modification and maintenance of control valves
  • Provision of skilled manpower and specialist services for several OEMs

Plant Description:

  • 8 ST x 300 MW, 8 MSF x 12 MIGD
  • 8 BLR x 975 t/h

Client: Ministry of Water & Electricity
Execution Period: 2007 – 2012
Contract Value: € 19 Million
Services: Maintenance

Project Description:

  • Maintenance of field instruments and control systems
  • Modification and maintenance of control valves
  • Provision of skilled manpower and specialist services for several OEMs

Plant Description:

  • 8 ST x 300 MW, 8 MSF x 12 MIGD
  • 8 BLR x 975 t/h

M-Power / Iberdrola Project

M-Power / Iberdrola Project show reference
Page 1

Client: M-Power / Iberdrola
Execution Period: 2007 – 2010
Contract Value: € 34 Million
Services: Construction

Project Description:

  • Erection of 6x 9FA gas turbines and generators, including auxiliary equipment, BOP piping and auxiliary boiler
  • Fabrication, supply and installation of ventilation ducts, structural works
  • BOP electrical installation works
  • Erection and testing of substation transformers

Plant Description:

  • 2000 MW – Combined cycle power plant
Page 2

Client: M-Power / Iberdrola
Execution Period: 2007 – 2010
Contract Value: € 34 Million
Services: Construction

Project Description:

  • Erection of 6x 9FA gas turbines and generators, including auxiliary equipment, BOP piping and auxiliary boiler
  • Fabrication, supply and installation of ventilation ducts, structural works
  • BOP electrical installation works
  • Erection and testing of substation transformers

Plant Description:

  • 2000 MW – Combined cycle power plant
Page 3

Client: M-Power / Iberdrola
Execution Period: 2007 – 2010
Contract Value: € 34 Million
Services: Construction

Project Description:

  • Erection of 6x 9FA gas turbines and generators, including auxiliary equipment, BOP piping and auxiliary boiler
  • Fabrication, supply and installation of ventilation ducts, structural works
  • BOP electrical installation works
  • Erection and testing of substation transformers

Plant Description:

  • 2000 MW – Combined cycle power plant

Client: M-Power / Iberdrola
Execution Period: 2007 – 2010
Contract Value: € 34 Million
Services: Construction

Project Description:

  • Erection of 6x 9FA gas turbines and generators, including auxiliary equipment, BOP piping and auxiliary boiler
  • Fabrication, supply and installation of ventilation ducts, structural works
  • BOP electrical installation works
  • Erection and testing of substation transformers

Plant Description:

  • 2000 MW – Combined cycle power plant

EMAL Power Plant

EMAL Power Plant show reference
Page 1

Client: Emirates Aluminum
Execution Period: 2009 – 2010
Contract Value: € 28.7 Million
Services: Construction & BOP

Project Description:

  • Construction of 2000 MW power complex at the aluminum smelter
  • Erection of 4 HRSGs and BOP equipment and piping for 6 gas turbines and 2 steam turbines including welding, NDT, hydro testing, refractory and insulation works and commissioning support
  • Erection of sea water intake equipment and associated pipe work, including pre-commissioning

Plant Description:

  • Aluminum smelter with 2000 MW power plant
Page 2

Client: Emirates Aluminum
Execution Period: 2009 – 2010
Contract Value: € 28.7 Million
Services: Construction & BOP

Project Description:

  • Construction of 2000 MW power complex at the aluminum smelter
  • Erection of 4 HRSGs and BOP equipment and piping for 6 gas turbines and 2 steam turbines including welding, NDT, hydro testing, refractory and insulation works and commissioning support
  • Erection of sea water intake equipment and associated pipe work, including pre-commissioning

Plant Description:

  • Aluminum smelter with 2000 MW power plant

Client: Emirates Aluminum
Execution Period: 2009 – 2010
Contract Value: € 28.7 Million
Services: Construction & BOP
  
Project Description:

  • Construction of 2000 MW power complex at the aluminum smelter
  • Erection of 4 HRSGs and BOP equipment and piping for 6 gas turbines and 2 steam turbines including welding, NDT, hydro testing, refractory and insulation works and commissioning support
  • Erection of sea water intake equipment and associated pipe work, including pre-commissioning

Plant Description:

  • Aluminum smelter with 2000 MW power plant

SEC Qurrayah

SEC Qurrayah show reference
Page 1

Client: Saudi Electricity Company
Execution Period: 2010 – 2012
Contract Value: € 40 Million
Services: EPC

Project Description:

  • Upgrade fuel oil system to enable Light Arabian Crude (LAC) oil firing 24/7, emission reduction by 25%
  • Design, supply and installation of soot-blowers, wash water system, air pre-heater baskets, waste water pumps, chemical dosing stations, high pressure online air heater washing system

Plant Description:

  • 4 Boilers 2100 t/h, 650 MW each, primarily gas fired
Page 2

Client: Saudi Electricity Company
Execution Period: 2010 – 2012
Contract Value: € 40 Million
Services: EPC

Project Description:

  • Upgrade fuel oil system to enable Light Arabian Crude (LAC) oil firing 24/7, emission reduction by 25%
  • Design, supply and installation of soot-blowers, wash water system, air pre-heater baskets, waste water pumps, chemical dosing stations, high pressure online air heater washing system

Plant Description:

  • 4 Boilers 2100 t/h, 650 MW each, primarily gas fired

Client: Saudi Electricity Company    
Execution Period: 2010 – 2012
Contract Value: € 40 Million
Services: EPC

Project Description:

  • Upgrade fuel oil system to enable Light Arabian Crude (LAC) oil firing 24/7, emission reduction by 25%
  • Design, supply and installation of soot-blowers, wash water system, air pre-heater baskets, waste water pumps, chemical dosing stations, high pressure online air heater washing system

Plant Description:

  • 4 Boilers 2100 t/h, 650 MW each, primarily gas fired